PSS were commissioned to design and install a bespoke scaffolding loading platform and truss-out system over the Swansea to London up line. The project was completed during scheduled line blocks provided by Network Rail and required meticulous planning, coordination, and safety management.
Working closely with NR representatives, our team ensured the line remained fully protected throughout the operation. All works were carried out by our qualified PTS rail operatives under our RISQS-audited and verified status.